Construction begins on new drive-thru at Main Branch

The Mentor Avenue driveway at our Main Branch will be closed during construction.

The Mentor Avenue driveway at our Main Branch will be closed during construction.

 

Construction on the new drive-thru began this Monday at our Main Branch.

The orange barrels are expected to all be cleared out by June. Then, you’ll be able to pick up your holds at Main without even leaving your car.

During construction, the branch’s Mentor Avenue driveway will be closed.

You’ll still be able to reach our main lot via Lauren J Drive, as well as park in our auxiliary lot at the corner of Mentor Avenue and Sharonlee Drive.

Additionally, you’ll still be able to drop off items outside of the building.

The outdoor book and audiovisual drop-off boxes have moved but are still available during the construction.

The outdoor book and audiovisual drop-off boxes have moved but are still available during the construction.

Along with the drive-thru, there are changes coming to the traffic flow around our Main Branch.

When the Mentor Avenue drive-thru is completed, the lane will become exit only. Also, drivers will only be able to turn right from the drive-thru onto Mentor Avenue to prevent traffic backup.

Finally, the library is also adding a concrete barrier lift gate with sensors in front of the drive-thru’s transaction window as a safety precaution.

drivethru pc_Page_1

This entry was posted in Uncategorized and tagged , . Bookmark the permalink.

Comments are closed.